ETEP, Phase 2

The Emergency Tidal Escape Platform table-like object is taking its next steps. In preparation for the arrival of our model train figures, we started to set up a rigging system to load boxes from the beach to the platform.

Pulley and wire (wire from a guitar string, left over after a Robert Cray show):

Rigged box:


Beach staging area:


The view from above: